Institucional

CLIAPORTO brings together in its facilities a modern modular operational structure that serves as a logistic support headquarters to meet the purpose of each client. With CLIAPORTO you will have from the simplest storage, to the most complex logistics process with the capacity to receive and drain cargo, both by land and by sea.

It also has a specialized and experienced team for the manufacture of infrastructure and technology equipment for Subsea and Topside, as well as decommissioning resources, carried out in its large yard for industrial assembly. An unparalleled range of possibilities at your disposal.

Infrastructure

CLIAPORTO currently gathers in its facilities:

  • General Warehouse
  • Main wharf: 40m (Calado 5.5 m)
  • Auxiliary wharf: 40m (Calado 4 m)
  • Admin Center.: 5,000 m
  • General Warehouse: 20.800m
  • Terminal : 5,000 m²
  • Industrial Courtyard / Covered Warehouse: 4,200 m²
  • Industrial Yard / Uncovered Warehouse: 58,000 m²
  • Parking: 2,500 m²
  • Retroarea: 2,500 m²

PLANNED DEVELOPMENT

We are investing and implementing new innovations in the infrastructure of Niterói headquarters that will bring even more facilities and possibilities for our customers:

CLIAPORTO

CLIA PORTO will have 4 headquarterss strategically located along the Brazilian coast around the Pre-salt Polygon with direct maritime access to Santos, Campos and Espírito Santo basins, ranging from the simplest storage to the most complex logistics process with capacity to receive and drain cargo, both by land and by sea.

HSEQ - Integrated Policy of Health, Safety, Environment and Quality at work.

CLIAPORTO sets out its principles and commitment of management in relation to its performance of Management Systems through the Integrated Policy on Health, Safety, Environment and Quality at Work, as described below:
The Integrated Policy on Health, Safety, Environment and Quality at Work adopted by CLIAPORTO, company specialized in Area and Wharf Management and Supply of Facilities for the development of Support and Port Operation activities, Logistics Operation, Cargo Storage, Vessel Maintenance, Assignment of Administrative Area and Miscellaneous Operations for Own Services, Related Companies and Customers in General is based and committed to:

  1. Utilize your HSEQ Management System as a tool to provide continuous improvement in your processes and in establishing and controlling the performance of the HSEQ Objectives;
  2. Consistently meet customer requirements, statutory, legal and regulatory requirements applicable to contracted activities, seeking to meet customer, employees, shareholders and stakeholders expectations;
  3. Analyze risks and opportunities and prevent deficiencies so that these expectations are obtained with the lowest cost and maximum productivity;
  4. Identify and control environmental aspects/impacts and hazards/damages arising from their activities, with emphasis on waste management and high-risk work of the enterprises;
  5. Ensure the prevention of pollution, injury and occupational diseases;
  6. Promote awareness and training of workers in the HSEQ issues, emphasizing leaderships.

The obligation to know and practice the precepts of Health, Safety, Environment and Quality at Work are of all Members and Subcontractors. Leadership functions at all levels are responsible for the implementation and dissemination of these commitments. This policy is communicated to all members of CLIAPORTO through integration lectures, noticeboard, posters or banners and is available to stakeholders on the internet site www.CLIAPORTO.com.br. It is critically analyzed to maintain its adequacy in critical analysis by the management.

UTC Group - A new page in our history

The UTC Group comes forward to communicate a commitment made to the government, and through it, to society.
This commitment is constituted by the leniency agreement closed and duly signed by us with the Ministry of Transparency, Supervision and Control – Comptant General of the Union (CGU) and with the Attorney General of the Union (AGU).
The Group UTC assumes responsibility for change.
Change is to improve our corporate governance, which we have already started doing since the start of negotiations more than two years ago. Change is to implement a Integrity Program, which is fully functioning. Change is to adopt a zero-tolerance policy with corruption and fraud, which integrates all our processes.

The new moment of the UTC Group, which we announce at this time, involves all our employees, partners, suppliers and customers. It involves, above all, the relationship with governments, with which we come to live in a high level of integrity and ethics.
This commitment requires continuous vigilance and improvement and transparency in information. We will maintain our technical tradition and the high standard of engineering that we are proud of, but we will act attentively to the highest levels of integrity and intolerance with corruption and fraud. It's the UTC Group turning the page of its history.

Founded as a holding company in 1997, UTC Participações S.A. controls UTC International, Constran Internacional, Cobrazil, Cliaporto and MAPE. It offers solutions for projects to clients throughout Brazil, especially in the areas of industrial assembly, infrastructure, oil and gas (onshore and offshore), ship repair, logistics, heavy construction, industrial construction and real estate development.

  • GreenField Projects
  • Engineering, Procurement, Construction and Assembly
  • Construction of Platforms
  • Construction of Modules
  • Integration of Process Modules
  • Processing and Logistics
  • Construction of Refineries
  • Construction of Petrochemical Industries
  • Construction of Terminals and Tanks
  • Construction and Assembly
  • Electromechanics
  • Energy
  • Siderurgy
  • Steel Mining
  • Paper and Cellulose
  • Offshore Logistics Headquarters
  • General Warehouse
  • Bonded Terminal
  • Subsea Equipment Fabrication
  • Patio for Industrial Assembly
  • Drilling Fluids
  • Jumpers
  • Manifolds
  • Heavy Construction
  • Railroads
  • Highways
  • Subway
  • Bridges and Viaducts
  • Hydroelectric Plants and Dams
  • Buildings
  • Tunnels
  • Airoports
  • Pipelines
  • Ports
  • Towers and Commercial Complexes
  • Hospitals
  • Education, Sports and Culture
  • Shopping Centers, Commercial Centers and Retrofits
  • Hotels and Entertainment
  • Industries
  • Housing
  • Earthworks, Paving, Infrastructure and Sanitation